Schrader-Type Valves
- Put on safety goggles and cover vehicles fender. Slowly remove protective caps from Schrader valves to check for leaky valves.CAUTION: Ensure hand valves on manifold gauge set and the hose-end shutoff valves are closed before attaching test hoses to Schrader valves.
- Ensure service hoses are equipped with valve core depressor to match Schrader valve. If not, install special adapters for this purpose. If the high-side service hose connector will not fit on high-side Schrader valve, a special adapter must be used. See SPECIAL VALVE CONNECTORS .
- Ensure both manifold gauge set hand valves are closed. Connect low-side service hose to low-side (suction) service valve and finger tighten connections. Connect high-side service hose to high-side (discharge) service valve and finger-tighten connections.
NOTE:
After test gauges are installed, test hoses must be purged of all air before proceeding with testing.