LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Alfa Romeo >> 2019 >> Giulia Base, AWD >> Repair and Diagnosis >> Heating, Ventilation & A/C (HVAC) >> HVAC Control Systems >> Heating & Air Conditioning >> Plumbing >> Line, A/C Suction >> Removal And Installation >> 2.0L >> Installation

Removal And Installation: 2.0L: Installation

CAUTION:

Be certain to adjust the refrigerant oil level when servicing the A/C refrigerant system. Failure to properly adjust the refrigerant oil level will prevent the A/C system from operating as designed and can cause serious A/C compressor damage.

NOTE:

When replacing multiple A/C system components, see the Refrigerant Oil Capacities chart to determine how much oil should be added to the refrigerant system. Refer to OIL, REFRIGERANT, STANDARD PROCEDURE .

NOTE:

Replacement of the refrigerant line seals is required anytime a refrigerant line is disconnected. Failure to replace the rubber O-ring seals may result in a refrigerant system leak.

GC0197828Courtesy of CHRYSLER GROUP, LLC
  1. Remove the tape or plugs from the opened refrigerant line fittings.
    NOTE:

    Lubricate NEW  seals with clean refrigerant oil and install them onto the open refrigerant line fittings. Use only the specified seals as they are made of a special material for the system. Use only refrigerant oil of the type recommended for the A/C compressor in the vehicle.

  2. Install the A/C suction line (1) to the A/C suction jumper line. Install a NEW O-ring seal. 
  3. Install the A/C suction line retaining clamps (4a)
  4. Remove the tape or plugs from the opened refrigerant line fittings.
    NOTE:

    Lubricate NEW  seals with clean refrigerant oil and install them onto the open refrigerant line fittings. Use only the specified seals as they are made of a special material for the system. Use only refrigerant oil of the type recommended for the A/C compressor in the vehicle.

  5. Install the A/C suction line (2a) to the expansion valve. Install a NEW O-ring seal. 
  6. Install the nut (2b) that secures the A/C suction line (2a) to the expansion valve and tighten to the proper specification. Refer to TECHNICAL SPECIFICATIONS .
  7. Install the engine cover. Refer to COVER, ENGINE, REMOVAL AND INSTALLATION .
  8. Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector.
  9. Adjust the refrigerant oil level. Refer to OIL, REFRIGERANT, STANDARD PROCEDURE .
  10. Charge the refrigerant system. Refer to PLUMBING, STANDARD PROCEDURE .