LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Alfa Romeo >> 2019 >> Giulia Base, AWD >> Repair and Diagnosis >> Electrical >> Motors, Switches, Relays >> Battery System (Service Information) >> Cables, Battery >> Removal And Installation >> Battery Cable Junction Block To Generator And Starter >> Installation

Battery Cable Junction Block To Generator And Starter: Installation

GC0197884Courtesy of CHRYSLER GROUP, LLC
  1. Install the wiring harness (1a) to the B+ stud on the starter and install the nut (1b) on the B+ stud and tighten securely.
    GC0198597Courtesy of CHRYSLER GROUP, LLC
  2. Install the starter electrical connector (1).
    GC0197813Courtesy of CHRYSLER GROUP, LLC
  3. Position the wiring harness in the retaining clip (2) and securely tighten the bolts (1a) in the retainers (1b) for the wiring harness.
    GC0198591Courtesy of CHRYSLER GROUP, LLC
  4. Install the wiring harness connector (1) in to the engine oil level sensor.
    GC0198249Courtesy of CHRYSLER GROUP, LLC
  5. Install the bolts (1a) to the wiring harness retainers and tighten securely.
    GC0197830Courtesy of CHRYSLER GROUP, LLC
  6. Install the bolt (1a) to the wiring harness retainer and tighten securely.
    GC0198200Courtesy of CHRYSLER GROUP, LLC
  7. Install the wiring harness (1c) on the B+ stud of the generator and install the nut (1b) and tighten to the proper specification. Refer to TECHNICAL SPECIFICATIONS .
  8. Install the generator B+ cover (1a).
    GC0197474Courtesy of CHRYSLER GROUP, LLC
  9. Install the engine mount (1b) to the engine and install the engine mount bolts (1a) and tighten to the proper specification. Refer to TORQUE SPECIFICATIONS  .
  10. Install the front suspension crossmember. Refer to CROSSMEMBER, FRONT SUSPENSION, REMOVAL AND INSTALLATION .
  11. Remove the support and lower the vehicle.
    GC0198451Courtesy of CHRYSLER GROUP, LLC
  12. Install the wiring harness (1b)to the Junction block B+ stud and install the nut (1a) and tighten to the proper specification. Refer to TECHNICAL SPECIFICATIONS .
    GC0197784Courtesy of CHRYSLER GROUP, LLC
  13. Install the cover to the junction block (1a).
  14. Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector.