LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Alfa Romeo >> 2019 >> Giulia Base, AWD >> Repair and Diagnosis >> Heating, Ventilation & A/C (HVAC) >> A/C Compressor >> Heating & Air Conditioning >> Plumbing >> Line, A/C Liquid >> Removal And Installation >> 2.9L >> Installation

Removal And Installation: 2.9L: Installation

CAUTION:

Be certain to adjust the refrigerant oil level when servicing the A/C refrigerant system. Failure to properly adjust the refrigerant oil level will prevent the A/C system from operating as designed and can cause serious A/C compressor damage.

NOTE:

When replacing multiple A/C system components, see the Refrigerant Oil Capacities chart to determine how much oil should be added to the refrigerant system. Refer to OIL, REFRIGERANT, STANDARD PROCEDURE .

NOTE:

Replacement of the refrigerant line O-ring seals is required anytime a refrigerant line is disconnected. Failure to replace the rubber O-ring seals could result in a refrigerant system leak.

GC0198150Courtesy of CHRYSLER GROUP, LLC
  1. If removed, position the mounting bracket and band (1a) on the A/C liquid line (1b), and securely tighten the nut (1c).
    GC0198565Courtesy of CHRYSLER GROUP, LLC
  2. Remove the tape or plugs from the refrigerant line fittings and expansion valve ports.
    NOTE:

    Lubricate NEW  O-ring seals with clean refrigerant oil and install them onto the refrigerant line fittings. Use only the specified O-ring seals as they are made of a special material for the system. Use only refrigerant oil of the type recommended for the vehicle.

  3. Position the A/C liquid line (2a) into the engine compartment.
  4. Engage the A/C liquid line (2a) with the expansion valve. Install a NEW O-ring seal 
  5. Install the nut (2b) that secures the A/C liquid line (2a) to the expansion valve and tighten the nut to the proper specification. Refer to TECHNICAL SPECIFICATIONS .
    GC0198464Courtesy of CHRYSLER GROUP, LLC
  6. Install the A/C liquid line retaining clamps (1a) to the strut tower.
  7. Connect the left front damper wiring harness connector (2).
    GC0198384Courtesy of CHRYSLER GROUP, LLC
  8. Install the A/C liquid line retaining clamps (1a).
  9. Connect the A/C pressure transducer wiring harness connector (2)
    GC0197873Courtesy of CHRYSLER GROUP, LLC
  10. Remove the tape or plugs from the refrigerant line fittings and expansion valve ports.
    NOTE:

    Lubricate NEW  O-ring seals with clean refrigerant oil and install them onto the refrigerant line fittings. Use only the specified O-ring seals as they are made of a special material for the system. Use only refrigerant oil of the type recommended for the vehicle.

  11. Connect the A/C liquid line to the condenser and install the nut (1b) that secures the A/C liquid line (1a) to the condenser and tighten the nut to the proper specification. Refer to TECHNICAL SPECIFICATIONS .
  12. Install the left turbocharger inlet tube. Refer to COOLER AND HOSES, CHARGE AIR, REMOVAL AND INSTALLATION .
  13. Install the left front spoiler motor.
  14. Install the A/C suction line. Refer to LINE, A/C SUCTION, REMOVAL AND INSTALLATION LINE, A/C SUCTION JUMPER, REMOVAL AND INSTALLATION .
  15. Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector.
  16. Adjust the refrigerant oil level. Refer to OIL, REFRIGERANT, STANDARD PROCEDURE .
  17. Charge the refrigerant system. Refer to PLUMBING, STANDARD PROCEDURE .