LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Alfa Romeo >> 2019 >> Giulia Base, AWD >> Repair and Diagnosis >> Heating, Ventilation & A/C (HVAC) >> A/C Compressor >> Heating & Air Conditioning >> Plumbing >> Line, A/C Suction >> Removal And Installation >> 2.9L >> Installation

Removal And Installation: 2.9L: Installation

CAUTION:

Be certain to adjust the refrigerant oil level when servicing the A/C refrigerant system. Failure to properly adjust the refrigerant oil level will prevent the A/C system from operating as designed and can cause serious A/C compressor damage.

NOTE:

When replacing multiple A/C system components, see the Refrigerant Oil Capacities chart to determine how much oil should be added to the refrigerant system. Refer to OIL, REFRIGERANT, STANDARD PROCEDURE .

NOTE:

Replacement of the refrigerant line seals is required anytime a refrigerant line is disconnected. Failure to replace the rubber O-ring seals may result in a refrigerant system leak.

GC0194302Courtesy of CHRYSLER GROUP, LLC
  1. Remove the tape or plugs from the opened refrigerant line fittings.
    NOTE:

    Lubricate NEW  seals with clean refrigerant oil and install them onto the open refrigerant line fittings. Use only the specified seals as they are made of a special material for the system. Use only refrigerant oil of the type recommended for the A/C compressor in the vehicle.

  2. Install the A/C suction line (1) to the A/C suction jumper line (2a). Install a NEW O-ring seal. 
  3. Install the A/C suction line retaining clamps (3a)
    GC0194322Courtesy of CHRYSLER GROUP, LLC
  4. Remove the tape or plugs from the opened refrigerant line fittings.
    NOTE:

    Lubricate NEW  seals with clean refrigerant oil and install them onto the open refrigerant line fittings. Use only the specified seals as they are made of a special material for the system. Use only refrigerant oil of the type recommended for the A/C compressor in the vehicle.

  5. Install the A/C suction line (1b) to the expansion valve (1c). Install a NEW O-ring seal. 
  6. Install the nut (1a) that secures the A/C suction line (1c) to the expansion valve and tighten to the proper specification. Refer to TECHNICAL SPECIFICATIONS .
    GC0193501Courtesy of CHRYSLER GROUP, LLC
  7. Install the wiring harness connectors (1a) to the bracket (1b).
  8. Install the left air intake duct. Refer to BODY, AIR CLEANER, REMOVAL AND INSTALLATION .
  9. Install the engine cover. Refer to COVER, ENGINE, REMOVAL AND INSTALLATION .
  10. Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector.
  11. Adjust the refrigerant oil level. Refer to OIL, REFRIGERANT, STANDARD PROCEDURE .
  12. Charge the refrigerant system. Refer to PLUMBING, STANDARD PROCEDURE .