LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Alfa Romeo >> 2019 >> Giulia Base, AWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 19 (2.9L Pcm 2 - DTCS P2240-00 To U143B-00) >> DTC Troubleshooting >> P2370-00-Fuel Volume Regulator B Control Circuit-Open >> Diagnostic Test

Diagnostic Test

WARNING: This page is about a different variant/trim than selected.
  1. CHECK FOR AN ACTIVE DTC 
    1. Turn the ignition on.
    2. With the scan tool, read DTCs and record on the repair order.

      Is the DTC active or pending?

      Yes 

      • Go To  2

      No 

  2. CHECK THE (G123) FUEL QUANTITY SOLENOID 2 SUPPLY CIRCUIT 12.0 VOLT SUPPLY CIRCUIT FOR AN OPEN OR HIGH RESISTANCE 
    1. Turn the ignition off.
    2. Disconnect the Fuel Quantity Solenoid 2 harness connector.
    3. Disconnect the PCM-2 C1 harness connector.
    4. Measure the resistance of the (G123) Fuel Quantity Solenoid 2 Supply Circuit 12.0 Volt Supply circuit between the PCM-2 C1 harness connector and the Fuel Quantity Solenoid 2 harness connector.

      Is the resistance below 3.0 Ohms?

      Yes 

      • Go To  3

      No 

      • Repair the (G123) Fuel Quantity Solenoid 2 Supply Circuit for an open or high resistance.
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .
  3. CHECK THE (G123) FUEL QUANTITY SOLENOID 2 CONTROL CIRCUIT FOR AN OPEN/HIGH RESISTANCE 
    1. Measure the resistance of the (G123) Fuel Quantity Solenoid 2 Control circuit between the PCM-2 C1 harness connector and the Fuel Quantity Solenoid harness connector.

      Is the resistance below 3.0 Ohms?

      Yes 

      • Go To  4

      No 

      • Repair the (G123) Fuel Quantity Solenoid 2 Supply circuit for an open or high resistance.
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .
  4. CHECK THE FUEL QUANTITY SOLENOID 
    1. Replace the Fuel Quantity Solenoid 2 in accordance with the Service Information.
    2. Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .
    3. Turn the ignition on.
    4. With the scan tool, read PCM-2 DTCs.

      Did the DTC return?

      Yes 

      • Go To  5

      No 

      • Test complete.
  5. CHECK RELATED HARNESS CONNECTIONS 
    1. Disconnect all PCM-2 harness connectors.
    2. Disconnect all related in-line harness connections (if equipped).
    3. Disconnect the related component harness connectors.
    4. Inspect harness connectors, component connectors, and all male and female terminals for the following conditions:
      • Proper connector installation.
      • Damaged connector locks.
      • Corrosion.
      • Other signs of water intrusion.
      • Weather seal damage (if equipped).
      • Bent terminals.
      • Overheating due to a poor connection (terminal may be discolored due to excessive current draw).
      • Terminals that have been pushed back into the connector cavity.
      • Check for spread terminals and verify proper terminal tension.

      Repair any conditions that are found.

    5. Connect all PCM-2 harness connectors. Be certain that all harness connectors are fully seated and the connector locks are fully engaged.
    6. Connect all in-line harness connectors (if equipped). Be certain that all connectors are fully seated and the connector locks are fully engaged.
    7. Connect all related component harness connectors. Be certain that all connectors are fully seated and the connector locks are fully engaged.
    8. With the scan tool, erase DTCs.
    9. Test drive or operate the vehicle in accordance with the when monitored and set conditions.
    10. With the scan tool, read DTCs.

      Did the DTC return?

      Yes 

      No 

      • The wiring or poor connection problem has been repaired.
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .