LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Alfa Romeo >> 2019 >> Giulia Base, AWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 18 (2.9L Pcm 2 - DTCS P068A-00 To P2235-00) >> DTC Troubleshooting >> P06D2-00-Sensor Reference Voltage E Circuit-Open >> Diagnostic Test

Diagnostic Test

WARNING: This page is about a different variant/trim than selected.
  1. CHECK FOR AN ACTIVE DTC 
    NOTE:

    Improperly installed aftermarket accessories can cause this DTC to set. Check for any improperly installed aftermarket accessories before continuing with this test.

    1. Turn the ignition on.
    2. With the scan tool, read DTCs and record on the repair order.

      Is the DTC active or pending?

      Yes 

      • Go To  2

      No 

  2. CHECK THE SENSORS THAT SHARE THE 5-VOLT SUPPLY 
    1. IMPORTANT - FOLLOW THIS PROCEDURE EXACTLY WHEN CHECKING THE FOLLOWING COMPONENTS:  Turn the ignition off before disconnecting each component. After a component has been disconnected, turn the ignition on and measure the voltage on the (F859) 5-Volt Supply circuit at the PCM-2 harness connector. If the 5-Volt Supply voltage returns to 5.0 volts after disconnecting a component, the component that was disconnected is faulty. If the voltage remains low after disconnecting a component, then the disconnected component is not the problem. Leave each component disconnected and move on to the next until the faulty component is discovered or all components have been disconnected. Disconnect only one component at a time during this step.
    2. Disconnect the each harness connector, one at a time, of the components that have faults set against them and check the 5-Volt Supply circuit voltage.

      Were any of the components determined to be at fault?

      Yes 

      • Replace the faulty component in accordance with the Service Information.
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .

      No 

      • Go To  3
  3. CHECK THE (F859) SECONDARY 5-VOLT SUPPLY CIRCUIT FOR A SHORT TO VOLTAGE 
    NOTE:

    All of the components should still be disconnected during this test step.

    1. Measure the voltage on the (F859) Secondary 5-Volt Supply circuit at the harness connector.

      Is the voltage reading above 5.2 volts?

      Yes 

      • Repair the (F859) Secondary 5-Volt Supply circuit for a short to voltage.
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .

      No 

      • Go To  4
  4. CHECK THE (F859) 5-VOLT SUPPLY CIRCUIT FOR A SHORT TO GROUND 
    1. Turn the ignition off.
      NOTE:

      All of the components should still be disconnected during this test step.

    2. Disconnect the PCM-2 C2 harness connector from the PCM.
    3. Check for continuity between ground and the (F859) 5-Volt Supply circuit at the PCM-2 harness connector.

      Is there continuity between ground and the (F859) 5-Volt Supply circuit(s)?

      Yes 

      • Repair the (F859) 5-Volt Supply circuit for a short to ground.
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .

      No 

      • Go To  5
  5. CHECK RELATED HARNESS CONNECTIONS 
    1. Disconnect all PCM-2 harness connectors.
    2. Disconnect all related in-line harness connections (if equipped).
    3. Disconnect the related component harness connectors.
    4. Inspect harness connectors, component connectors, and all male and female terminals for the following conditions:
      • Proper connector installation.
      • Damaged connector locks.
      • Corrosion.
      • Other signs of water intrusion.
      • Weather seal damage (if equipped).
      • Bent terminals.
      • Overheating due to a poor connection (terminal may be discolored due to excessive current draw).
      • Terminals that have been pushed back into the connector cavity.
      • Check for spread terminals and verify proper terminal tension.

      Repair any conditions that are found.

    5. Connect all PCM-2 harness connectors. Be certain that all harness connectors are fully seated and the connector locks are fully engaged.
    6. Connect all in-line harness connectors (if equipped). Be certain that all connectors are fully seated and the connector locks are fully engaged.
    7. Connect all related component harness connectors. Be certain that all connectors are fully seated and the connector locks are fully engaged.
    8. With the scan tool, erase DTCs.
    9. Test drive or operate the vehicle in accordance with the when monitored and set conditions.
    10. With the scan tool, read DTCs.

      Did the DTC return?

      Yes 

      No 

      • The wiring or poor connection problem has been repaired.
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .